1. Home
  2. Industries
  3. Construction materials

Construction materials

Lower freight costs for construction materials

Building materials are heavy, bulky and often delivered to places that aren't built for trucks. That makes freight one of the biggest costs in the price of the product. We help suppliers and distributors lower it.

Independent freight savings advisorNot a broker or carrierNo upfront feesPaid only from savings verified on your invoices
  • 20+Years in logistics
  • $1B+Freight managed
  • 14 daysTo your written freight savings review
  • No upfront feesPaid only from savings verified on your invoices

Why construction freight is expensive

  • Loads hit the weight limit firstMany building products weigh out long before the trailer is full, so every pound of capacity matters.
  • Open-deck and specialized equipmentFlatbeds, step decks and trucks with liftgates or forklifts cost more and are harder to find in busy seasons.
  • Job site deliveriesLimited access, tight delivery windows and waiting time turn into extra charges.
  • Seasonal swingsBuilding season pushes volume and rates up at the same time.

What this looks like for building materials shippers

Examples we look for in a freight review.

  • Flatbed extras on every loadTarps, straps and permits are billed load by load. We check which charges are agreed in your rates and which ones keep showing up on top of them.
  • Job sites that aren't readyA truck arrives and the site can't unload, so you pay for waiting time or a second delivery. Confirmed delivery windows and clear site details cut detention and redelivery.
  • Liftgate and forklift trucks by defaultSpecialized trucks get ordered even where a dock or forklift is on site. Matching the equipment to each delivery costs less.
  • Paying peak rates in building seasonSpot rates rise when every shipper needs flatbeds at once. Planning capacity with your carriers before the season keeps more loads on agreed rates.

Industry data

How much truck space goes unused

The survey covered 200 shippers in industries including food and beverage, retail, building materials, industrial machinery and packaging. Third-party figures from the sources linked under each number. They are not Maximizer Team results and do not predict your savings.

Public research

What the EPA found

Heavy building products often weigh out before a trailer or railcar is full, which leaves paid-for space empty. An EPA SmartWay® bulletin describes ceramic tile maker Daltile, whose railcars typically weighed out with almost 4,000 cubic feet unused. By co-loading lighter freight on top of its tile pallets, Daltile cut transportation costs by up to 15% per load (EPA-420-F-19-014, 2019, p.2).

For loads that weigh out, EPA also points to lighter equipment such as aluminum plate wall trailers and plastic pallets (EPA-420-F-21-038, 2021, p.1).

Source: U.S. EPA SmartWay publications (2019, 2021). The examples and figures are EPA's, not Maximizer Team results. Maximizer Team is not affiliated with or endorsed by the U.S. EPA.

Who we work with

US building materials manufacturers, suppliers and distributors shipping to yards, dealers, retailers and job sites, typically with $1M or more in annual freight spend.

Dealing with retailer fines, deduction disputes or loss and damage claims? We can help with those too. See retailer deductions and chargeback recovery.

Why us

Why Maximizer Team

  • IndependentNot a broker or a carrier. We don't sell capacity or take carrier commissions, so our only interest is lowering your cost.
  • ExperiencedBased in Las Vegas and working with shippers nationwide, led by Michael Holvoet: 20+ years in logistics and $1B+ in freight managed across dry van, reefer, LTL, parcel and intermodal.
  • Paid on resultsNo upfront fees. We're paid only from savings verified on your invoices, measured against a baseline your finance team approves.
  • Built for mid-size and larger shippersMost clients spend $1M or more a year on freight.

Benchmark · Implement · Verify

How it works

  1. BenchmarkAfter a short intro call, you send 12 months of freight invoices and your rate files (we sign an NDA where appropriate). We build a baseline your finance team approves and compare your costs with the market.
  2. ImplementWe rank the opportunities by size and effort, then work with your team, carriers and warehouses to put the changes in place.
  3. VerifyEvery month we check paid invoices against the baseline and report realized savings, so you see what actually changed, not just what was promised.

FAQ

Frequently asked questions

More answers on our FAQ page

Do you review flatbed and open-deck freight?

Yes. The review covers every mode and equipment type on your invoices, including flatbed and step deck, alongside dry van, LTL and parcel.

Our deliveries go to job sites. Can you still help?

Yes. Job site deliveries often carry waiting time, redelivery and special-equipment charges. We look at where they come from and how to reduce them in your contracts and scheduling.

How much does it cost?

The 14-day freight savings review is free. There's no upfront fee. If you go ahead, we're paid only from savings verified on your invoices. Recovered deductions are tracked and reported as their own category of verified savings.

Are you a freight broker?

No. Maximizer Team is an independent freight savings advisor. We don't haul freight, sell capacity or take carrier commissions, so our advice isn't tied to any carrier.

Do you check tarp, permit and oversize charges?

Yes. Open-deck freight often carries tarp fees, permits, escorts and oversize or overweight charges on top of the line-haul rate. We check each one against your carrier agreements and the shipment details, and look for loads that could be built or routed to avoid them.

Our volume swings with the building season. Can you plan for that?

Yes. Building materials freight often peaks in spring and summer, when flatbed capacity is tight. We look at your volume by month and build that pattern into carrier agreements and shipping plans, so peak-season capacity and rates are planned ahead instead of bought at the last minute.

Find out what your construction freight should cost

Start with a short intro call. Then send us 12 months of freight invoices. In 14 days you'll get a free written review of your biggest freight savings opportunities.

Get my free freight reviewNo upfront fees. Paid only from savings verified on your invoices. NDA available.